GMP/GLP | Projects Expansion of ISO CGMP Yeoju Plant by Omni System Co., Ltd. (HVAC&UTILITY Design) ByONECLASS ENG 2025-01-222025-01-22
Design | Projects New Bio Sejong Factory New Construction (HVAC&UTILITY Design) ByONECLASS ENG 2025-01-222025-01-22
Design | Projects The One Cosmetics Incheon Plant Construction (HVAC&UTILITY Design) ByONECLASS ENG 2025-01-222025-01-22
GMP/GLP | Projects Aseptic operating room Construction for Theallmedi ByONECLASS ENG 2025-01-222025-01-22
Cosmetic | Projects Jinsung Medi CGMP Manufacturing Line Construction ByONECLASS ENG 2025-01-222025-01-22
Design | Projects Cosmetics Standard Incheon Plant Construction (HVAC&UTILITY Design) ByONECLASS ENG 2025-01-212025-01-21