What is Clean Room?

It is a space where suspended particulate materials in the air are managed below a prescribed cleanliness, and also the required cleanliness of the materials supplied to the space is maintained, and environmental conditions such as temperature, humidity, pressure, etc. are managed, and the shape, speed, harmful gas, vibration, and indoor illumination are required as management items.

Based on the experience of carrying out a number of FAB-construction with turnkey, the expected problems are presented in advance, and countermeasures are proposed to construct the interior, air conditioning, system sealing, automatic control, electricity, and utility of the cleanroom. Also, we are accumulating technologies that can be constructed with Turn-Key, from building planning to design, purchase, construction, quality control, commissioning and TAB.

A diverse group of business professionals engaged in a strategic meeting.

Consulting

Based on years of experience in performing construction and technical know-how, we identify and review expected problems in the initial planning stage of the project and present the best plan.

1. Receive Customer
2. Business Feasibility Review
3. Laws and Regulations Review 

4. Production Process Review
5. Cost Review
6. Submission of Optimal Solution


Design

From conceptual design to detailed design, the group of professional design personnel prepares investment savings with differentiated designs based on the characteristics of each product.

1. Cleanroom Conditions Review
2. System Selection
3. Heat Load Calculation

4. CleanLiness Review
5. Device Review


Construction

We take the lead in improving the production yield of customers with our constant research on construction technology, optimal construction management process, and know-how of turn-key construction experience accumulated over many years.

1. Schedule Management
2. Cost Control
3. Process Management
4. Safety Management

5. Quality Control
6. Material Selection Management
7. Cleanroom Construction
8. Test Run and Final Inspection


TAB

After completion of the construction, the overall system review and measurement of the clean room ensure that the design intention is satisfied and adjusted to meet the conditions suggested by the contractor.

1. Room Cleanliness Test
2. Filter Leak Test
3. Differential Pressure Test
4. Filter Surface wind Speed Test

5. Temperature & Humidity Test
6. Noise Test
7. Illumination Test
8. Equipment Performance Test

Architect wearing hard hat and mask reviews floor plans on site for new construction project.

Super Clean Room​

Based on the experience of carrying out a number of FAB-construction with turnkey, the expected problems are presented in advance, and countermeasures are proposed to construct the interior, air conditioning, system sealing, automatic control, electricity, and utility of the cleanroom. Also, We are accumulating technologies that can be constructed with Turn-Key, from building planning to design, purchase, construction, quality control, commissioning and TAB.

Use a clear and attention-grabbing short paragraph to engage your audience and draw them into reading the rest of your content.

Open Bay Method

Fan Filter Method

Utility​

The main LINE of UTILITY piping, which is connected to the production equipment inside the clean room, includes purified water, cooling water, steam, CDA, N2, PCW, wastewater and liquor, CV, PV piping, etc.

TAB

After the completion, a follow-up inspection is conducted to see if the design functions as intended.

Testing

Quantitative performance of each equipment

  • Design data review
  • Design load calculation
  • System diagram check
  • Measure Air Volume, Wind Speed, and Differential Pressure
Adjusting

Adjust the air each equipment appropriately

  • Establish a stable system
  • Check construction status​
  • System diagram check
  • Check construction volume and omission​
Balancing

Distribution system for  proportional flow rate

  • Energy saving​
  • Energy saving through distribution of used heat sources​
  • Pleasant environment ​
  • Inducing workers to improve work efficiency.​